Chapter 16.90 CONSTRUCTION PERMIT FEES

16.90.010 Intent.

16.90.020 Permit Fees.

16.90.030 Fee Schedule.

16.90.031 Exemption for SMUD Approved Residential Photovoltaic Solar System Projects.

16.90.010 Intent.

It is the intent of the Board of Supervisors to group the fees required for various permits, associated with the construction process, into one fee schedule as contained in this chapter. (SCC 686 § 8, 1987.)

16.90.020 Permit Fees.

a. The fee for each permit shall be that as prescribed in Section 16.90.030 of the Sacramento County Code.
b. The determination of value or valuation under any of the provisions of this Code shall be made by the Building Official. The value to be used in computing the permit fee shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fire extinguishing systems, and any other permanent equipment.
c. The new permit fee schedule will apply to all permit applications received on or after the effective date of the new permit fee ordinance.
Plans submitted for plan review prior to the effective date of the new permit fee ordinance may be issued under the old permit fee schedule for ninety (90) days. After the ninety (90) day grace period, all permits will be issued under the new permit fee schedule. (SCC 0727 § 1, 1988: SCC 686 § 8, 1987.)

16.90.030 Fee Schedule.

The construction permit fee schedule shall be as follows:
a. Permit Fees1. New buildings, additions, alterations, fill-ins/T.I.’s, remodels, fire repairs, solar, mobile/modular homes (permanent or temporary) and other structures requiring a plan review.
1. Permit fees for new Group R, Division 3 and U or S occupancies accessory to residential/agricultural use.
Total Valuation
Fee
$1.00 to 2,000.00
$389.26
$2,001.00 to 100,000.00
$389.26 + (0.02085 x valuation2 exceeding $2,000.00)
$100,001.00 and greater
$2,432.56 + (0.00973 x valuation2 exceeding $100,000.00)

2. Permit fees for the remodel of and/or additions to Group R, Division 3 and U or S occupancies accessory to residential/agricultural use.
Total Valuation
Fee
$1.00 to 2,000.00
$347.55
$2,001.00 to 20,000.00
$347.55 + (0.02224 x valuation2 $2,000.00 to $20,000.00)
$20,001.00 and greater
$747.87 + (0.01390 x valuation2 exceeding $20,000.00)

3. Permit fees for buildings other than Group R, Division 3 and U or S occupancies accessory to residential/agricultural use.
Total Valuation
Fee
$1.00 to 1,000.00
$ 403.16
$1,001.00 to 2,000.00
$ 656.18
$2,001.00 to 50,000.00
$ 656.18 + (0.03754 x valuation2 $2,001.00 to $50,000.00)
$50,001.00 to 500,000.00
$2,458.10 + (0.02085 x valuation2 $50,001.00 to $500,000.00)
$500,001.00 and greater
$11,840.60 + (0.01112 x valuation2 exceeding $500,000.00)
1 Total permit fee
2 Rounded up to the next multiple of $1,000.00

b. Plan Review Fee. Upon submittal of a plan for plan review, a plan review fee of forty (40) percent of the building permit fee shall be collected. When the permit is issued, the balance of the total permit fee (building permit fee plus plan review fee) is due.
c. Other Building Permit Fees1.
1. Carports, decks, patio covers, fences, reroof, demolitions, fire repairs, solar and other structures not requiring a plan review.
Total Valuation
Fee
$1.00 to 1,000.00
$115.38
$1,001.00 to 10,000.00
$115.38 + (0.02224 x valuation2 $1,000.00 to $10,000.00)
$10,001.00 and greater
$315.54 + (0.01390 x valuation2 exceeding $10,000.00)

2. Carports, decks, patio covers, fences, private garages, roof repitches, fire repairs, solar and other structures requiring a minimal plan review.
Total Valuation
Fee
$1.00 to 1,000.00
$230.77
$1,001.00 to 10,000.00
$230.77 + (0.02224 x valuation2 $1,000.00 to $10,000.00)
$10,001.00 and greater
$430.93 + (0.01390 x valuation2 exceeding $10,000.00)
1 Total permit fee
2 Rounded up to the next multiple of $1,000.00

d. Miscellaneous Plumbing Permit Fees.
Total Valuation
Fee
$1.00 to 1,000.00
$83.00
$1,001.00 to $10,000.00
$83.00 + (0.02224 x valuation1 $1,000.00 to $10,000.00)
$10,001.00 and greater
$283.16 + (0.01390 x valuation1 exceeding $10,000.00)
1 Rounded up to the next multiple of $1,000.00.

e. Miscellaneous Electrical Permit Fees.
Total Valuation
Fee
$1.00 to 1,000.00
$83.00
$1,001.00 to 10,000.00
$83.00 + (0.02224 x valuation1 $1,000.00 to $10,000.00)
$10,001.00 and greater
$283.16 + (0.01390 x valuation1 exceeding $10,000.00)
1 Rounded up to the next multiple of $1,000.00.

f. Miscellaneous Mechanical Permit Fees.
Total Valuation
Fee
$1.00 to 1,000.00
$83.00
$1,001.00 to 10,000.00
$83.00 + (0.02224 x valuation1 $1,000.00 to $10,000.00)
$10,001.00 and greater
$283.16 + (0.01390 x valuation1 exceeding $10,000.00)
1 Rounded up to the next multiple of $1,000.00.

g. Sign Permit Fees1.
1. Permit fee for illuminated signs (all types).
Total Valuation
Fee
$1.00 to 1,000.00
$230.77
$1,001.00 to 10,000.00
$230.77 + (0.02224 x valuation2 $1,000.00 to $10,000.00)
$10,001.00 and greater
$430.93 + (0.01390 x valuation2 exceeding $10,000.00)

2. Permit fee for nonilluminated signs (free standing).
Total Valuation
Fee
$1.00 to 1,000.00
$115.38
$1,001.00 and greater
$115.38 + (0.01390 x valuation2 exceeding $1,000.00)

3. Permit fee for nonilluminated signs (wall/appendage).
Total Valuation
Fee
$1.00 to 1,000.00
$94.53
$1,001.00 and greater
$94.53 + (0.01390 x valuation2 exceeding $1,000.00)
1 Total permit fee
2 Rounded up to the next multiple of $1,000.00

h. Swimming Pool/Spa Permit Fees1.
1. Permit fee for private pool.
Total Valuation
Fee
$1.00 to 1,000.00
$244.67
$1,001.00 to 10,000.00
$244.67 + (0.02224 x valuation2 $1,000.00 to 10,000.00)
$10,001.00 and greater
$444.83 + (0.01947 x valuation2 exceeding $10,000.00)

2. Permit fee for public pool.
Total Valuation
Fee
$1.00 to 1,000.00
$328.08
$1,001.00 to 10,000.00
$328.08 + (0.02224 x valuation2 $1,000.00 to 10,000.00)
$10,001.00 and greater
$528.24 + (0.01947 x valuation2 exceeding $10,000.00)

3. Permit fee for separate private or public spa.
Total Valuation
Fee
$1.00 to 2,000.00
$293.33
$2001.00 and greater
$293.33 + (0.01947 x valuation2 exceeding $2,000.00)
1 Total permit fee
2 Rounded up to the next multiple of $1,000.00

i. Mobilehome Installation Permit Fees (in a mobile home park).
Application filing fee
$20.00
Installation permit fee
$100.00 provided the inspection is not more than one hour, plus $30.00 for each 30 minutes or fraction in excess of one hour.
Reinspection fee
$ 60.00 provided the reinspection is not more than one hour, plus $30.00 for each 30 minutes or fractional part in excess of one hour.
Support system, skirting, steps, patio covers, awnings, decks, retrofit foundation system
Contract value with fee Subsection(c)(1)

j. Temporary Mobilehome (see Subsection (a)(1))
k. Building Compliance Inspection Fee. Building compliance inspection fees shall be a minimum of one hundred fifty-seven dollars and fifty cents ($157.50), not to exceed three hundred forty-seven dollars and fifty-five cents ($347.55), based on the extent and type of inspection, to be determined by the Building Official.
l. Inspection and posting of a Building to Be Moved Fee.
Application and inspection fee
$347.55

When the application indicates that the building is to be moved from a location outside of the County of Sacramento, the applicant shall pay an additional fee based on ninety-four dollars and fifty cents ($94.50) per hour plus forty-eight cents ($0.48) per mile to defray costs accrued outside of the unincorporated area of the County of Sacramento.
m. Other Inspections and Fees.
Issuance of each supplemental permit
$103.95
Inspection outside of normal business hours1
See current Labor Rate Schedule
Inspections for which no fee is specifically indicated
See current Labor Rate Schedule
Each reinspection
$157.50
Administrative Fee, Temporary Certificate of Occupancy
$138.60
Issuance of duplicate Certificate of Occupancy
$55.65
Permit research letter
See current Labor Rate Schedule
Additional plan review required by changes, additions, or revisions to approved plans2
See current Labor Rate Schedule
Plan review for miscellaneous permits2
See current Labor Rate Schedule
Boundary adjustment reviews2
Directly billed based upon labor charges
Preapplication building reviews
Directly billed based upon labor charges
Unfinaled permit investigations2
Directly billed based upon labor charges
Expedited plan reviews
Normal plan review fees plus costs directly billed based upon labor charges
UBC Lot Line waiver
Directly billed based upon labor charges
Filing fee for Building Board of Appeals
$210.00
Filing fee for Handicap Board of Appeals
$210.00
Abatement of Building Code Violation(s)
Directly billed based upon current labor charges plus all other associated costs to abate the violation including, but not limited to, fencing, board-up, repair, demolition, mailings, postings, recordings, appeals, hearing officer costs, inspection warrants, attorneys’ fees, administrative costs and collection costs.
1 Minimum charge: Three hours
2 Minimum charge: One-half hour

n. Long Range Planning Fee. A fee of seven percent of the total permit fee (building permit fee and plan review fee) shall be charged for all permits that require a review by the Department of Planning pursuant to Section 115.06 of the Sacramento County Zoning Code.
o. Environmental Compliance Fee. A fee of forty dollars ($40.00) shall be charged by the Department of Environmental Review and Assessment for all Business Permits issued pursuant to Subsections (a)(1) and (a)(3) of this Section. (SCC 1392 § 1, 2008: SCC 1358 § 1, 2007: SCC 1339 § 1, 2006: SCC 1256 § 1, 2003; SCC 1077 § 1, 1997; SCC 1054 § 1, 1996; SCC 1012 § 1, 1995; SCC 0933 § 1, 1993; SCC 0899 § 1, 1992; SCC 0858 § 1, 1991; SCC 0851 § 2, 1991; SCC 0816 § 1, 1990; SCC 783 § 1, 1989; SCC 686 § 8, 1987; SCC 0727 § 2, 1988.)

16.90.031 Exemption for SMUD Approved Residential Photovoltaic Solar System Projects.

Existing residential buildings that are installing Residential Photovoltaic Solar System Projects with SMUD Interconnection Agreements shall be exempt from all building permit and plan review fees set forth in this Chapter 16.90. This Section shall expire and shall not be effective after December 31, 2009. (SCC 1348 § 1, 2007.)